Monday, September 27, 2010

Week #30

Lots of progress has happened since the last time I updated this thing! The living room, kitchen, dining room, laundry room, and bathroom were all taped and textured.  After taping and texturing, we needed to prime everything and then paint!  In addition to the inside work, we also got front and backsteps. 

Charlie's dad came to visit and helped me with some of the priming on the ceiling.  His sister also came for a few days and helped me finish the painting.  Once the painting was finished we were ready for cabinets!  Our cabinets have actually been ready since June and sitting in Grand Forks.


 The beginning of the front steps . . .

 The beginning of the backsteps . . . .

Cabinet installation in progress!

Bathroom taping and texturing . . . 
 Laundry room tape and texture . . .

 Charlie and I installed SnapStone flooring in our bathroom.  He did the installing (I did get to use the tile saw to do a few cuts) and then I did the grout work.
 KITCHEN!!! Well, minus countertops, flooring and a sink . . . but still HUGE PROGRESS!!!

Our back patio . . . I apparently slacked on taking pictures of this in progress.  I also have not taken any day time pics.  I will post some next time.

Same story with the front steps and walkway . . . 
 The master bathroom (formerly the pink bathroom).  It still needs small stuff like trim, outlets and a mirror but like everything else, it has come a long way.